Methuen open Mon to SatEpping open Mon to Sat
Plan it this winter, enjoy it this spring. Lock in 2026 pricing
NH deliveries are tax free978-689-4414

Home › Permits

Shed, Garage, ADU & Pavilion Permits in New England

By New England Outdoor · Reviewed · Every rule below links to the law or code it comes from.

Short answer: a small one-story shed often doesn't need a building permit. In Massachusetts, Connecticut and Maine the state code sets the line at 200 sq ft[1, 2, 3], but in Rhode Island it's just 64 sq ft[4]. A detached garage needs a permit wherever the code is enforced[1, 2, 5], and so does an ADU[6, 7, 8].

Skipping a building permit never skips zoning: setbacks and lot limits still apply[1, 2]. Pick what you're building for the full guide.

Do you need a building permit? By state

StateShedsGaragesADUsPavilions
MassachusettsUsually not
If 200 sq ft or less[1]
YesYes
1 by right, up to 900 sq ft[9, 10]
Usually
New HampshireUsually not
If 200 sq ft or less[11]
Yes
Where town enforces[12]
Yes
1 by right, up to 950 sq ft[8]
Usually
Over 200 sq ft[11]
MaineDepends
Exempt from state code ≤200 sq ft[3]
YesYes
At least 1 allowed per lot[13]
Depends
Timber frame: ask[14]
VermontDepends
Zoning permit, no state permit[15, 16]
Depends
Zoning permit, no state permit[15]
Yes
1 by right + wastewater permit[17, 18]
Depends
Zoning permit[19]
ConnecticutUsually not
If 200 sq ft or less[2]
YesYes
1 as of right, unless town opted out[7]
Usually
Rhode IslandYes
Over 64 sq ft[4]
YesYes
By right on lots of 20,000+ sq ft[20]
Yes
Over 64 sq ft[4]

“Yes” means a building permit is needed wherever the code is enforced. Zoning, wetlands and shoreland rules apply either way. Tap a state for the details and sources.

How permitting works

Two separate checks: the building code and your town's zoning.

Building permit vs. zoning

The building permit checks the structure itself: foundation, framing, roof, and for an ADU, everything that makes it safe to live in. Each state adopts a building code, and your local building official enforces it[1, 21].

Zoning decides where a building can go and how big it can be: setbacks from lot lines, height, lot coverage and how many accessory buildings you can have. Towns write these rules under state enabling laws[9, 22, 23], so they vary from town to town. In several states, zoning has to sign off before a building permit can be issued[24, 25].

Size thresholds

The national residential code that New England's states build on exempts small one-story detached accessory buildings from the building permit. Massachusetts, Connecticut and Maine use 200 sq ft[1, 2, 3]; Rhode Island uses just 64 sq ft[4]. New Hampshire is also 200 sq ft under its current code[11]. Vermont has no state building code for owner-occupied homes, so the town zoning permit is what counts there[15, 16].

Other approvals that can apply

Near a wetland, stream, lake or the coast, a separate state or local review can apply before you build[26, 27, 28, 29, 30]. Historic districts need their own sign-off[31, 32].

What the town asks for

Usually a plot plan showing the building and its distances to the lot lines, plus construction drawings[1, 33]. For a garage or ADU, expect inspections as the work goes, through a final inspection.

How long it takes

Several states set a deadline once the application is filed: 30 days in Massachusetts, Connecticut and New Hampshire[1, 34, 35], and Rhode Island requires a review within 15 days[36]. In Maine, no written decision within 30 days counts as a refusal you can appeal[37]. Wetlands or zoning reviews can add time before you apply.

We make the permit easy

Everything your building department asks for, from us

Nearly all of our customers pull their own permit, because we give them the paperwork the town wants to see:

  • Architectural drawings or a spec sheet, depending on the building
  • Truss, rafter, beam and joist seals
  • Foundation and footing plans (garages, ADUs, pavilions)
  • Stamped plans if your town needs them, for an extra fee

Rather not deal with the town yourself? We can handle the permit for you for a fee. The fee depends on what we're building, so contact us about the permit fee.

Questions about your permit?

Tell us what you're planning and your town. We'll tell you what the building department will likely ask for, quote the building, and quote the permit fee if you'd like us to handle it.

  • No obligation
  • Permit paperwork included with every building
  • 0% financing for 18 months
  • Prefer to call? 978-689-4414

Want instant pricing? Design & price your shed in 3D.

Permit questions

That’s set by your town’s zoning, not the state code[9, 22], and it varies a lot. Check your town’s zoning bylaw or call the zoning office.

Massachusetts, Connecticut and New Hampshire give the building official 30 days to decide[1, 34, 35], and Rhode Island requires a review within 15 days[36]. Wetlands or zoning reviews can add time.

No. Even a building that doesn’t need a building permit still has to meet zoning setbacks and other local rules[1, 2, 4].

Nearly all of our customers pull their own, because we give them the drawings and seals the building department asks for (stamped plans cost extra, when a town needs them). If you’d rather we handle it, we can for a fee. Contact us about the permit fee.

Sources

We read each rule in the official statute, code or town bylaw and link it here, with the date we last checked it.

  1. 780 CMR 51.00, Massachusetts Residential Code, Chapter 1 (Scope and Administration) checked Nov 3, 2026
  2. 2022 Connecticut State Building Code (amendments to the 2021 IRC) checked Nov 3, 2026
  3. 2021 IRC R105.2 (Work exempt from permit), Building item 1 — adopted by 08-003 C.M.R. Ch. 6 without changing item 1 checked Nov 3, 2026
  4. 510-RICR-00-00-2, Rhode Island One and Two Family Dwelling Code (SBC-2) checked Nov 3, 2026
  5. R.I. Gen. Laws § 23-27.3-113.1 (When permit is required) checked Nov 3, 2026
  6. 760 CMR 71.01(3) Statement of Purpose checked Nov 3, 2026
  7. CGS §8-2o (accessory dwelling units), as amended by Public Act 26-7 checked Nov 3, 2026
  8. RSA 674:72 (Accessory dwelling units) checked Nov 3, 2026
  9. M.G.L. c. 40A, §1A (Zoning Act definitions) checked Nov 3, 2026
  10. M.G.L. c. 40A, § 3 (ADU paragraph, added by St. 2024, c. 150, § 8) checked Nov 3, 2026
  11. NH Building Code Review Board, 'New Hampshire Building Code including Amendments, July 1, 2026' (courtesy summary; ratified per HB1159-2026), State Building Code Administrative Amendment (C1-24-01-25), Section 105.2.2 International Residential Code, Building item 1, p. 19; copy hosted by Town of Merrimack checked Nov 3, 2026
  12. RSA 155-A:2, III and RSA 155-A:3, I checked Nov 3, 2026
  13. 30-A M.R.S. §4364-B(1) and (3)(A) checked Nov 3, 2026
  14. 10 M.R.S. §9724(5)(A) checked Nov 3, 2026
  15. 20 V.S.A. §2730 (Definitions: public building) checked Nov 3, 2026
  16. 24 V.S.A. § 4449(a)(1) (Zoning permit) checked Nov 3, 2026
  17. 24 V.S.A. § 4412(1)(E) checked Nov 3, 2026
  18. 10 V.S.A. § 1973(a)(6) (Permits) checked Nov 3, 2026
  19. 24 V.S.A. § 4303 (definition of land development) checked Nov 3, 2026
  20. R.I. Gen. Laws § 45-24-73(a) checked Nov 3, 2026
  21. CGS § 29-253(a), Code applicable to all municipalities checked Nov 3, 2026
  22. CGS § 8-2(a)(1) (2026 Supplement) checked Nov 3, 2026
  23. RSA 674:16, I (Grant of Power) checked Nov 3, 2026
  24. M.G.L. c. 40A, § 7 (Zoning Act — enforcement) checked Nov 3, 2026
  25. CGS § 8-3(f) (2026 Supplement); also 2022 CSBC IRC § R105.3.1.2 checked Nov 3, 2026
  26. 310 CMR 10.02(2)(b) Activities Within the Buffer Zone (MassDEP Wetlands Protection Act Regulations) checked Nov 3, 2026
  27. RSA 483-B:5-b, I(a) checked Nov 3, 2026
  28. 06-096 C.M.R. Ch. 1000 §16(B) (Permits Required) checked Nov 3, 2026
  29. CGS § 22a-42a(c)(1), Inland Wetlands and Watercourses Act (CGS 22a-36 to 22a-45) checked Nov 3, 2026
  30. CRMC Red Book, 650-RICR-20-00-1, § 1.1.4(A) checked Nov 3, 2026
  31. M.G.L. c. 40C, § 6 (Historic Districts Act) checked Nov 3, 2026
  32. CGS § 7-147d(a)-(b) checked Nov 3, 2026
  33. R.I. Gen. Laws § 23-27.3-113.5 (Plans and specifications) checked Nov 3, 2026
  34. CGS § 29-263(a); 2022 CSBC IRC § R105.3.1 checked Nov 3, 2026
  35. RSA 155-A:4, IX checked Nov 3, 2026
  36. R.I. Gen. Laws § 23-27.3-114.1(a) (Action on application) checked Nov 3, 2026
  37. 30-A M.R.S. §4103(3); MUBEC amendment to IRC R105.3.1 (08-003 C.M.R. Ch. 6 item 14) checked Nov 3, 2026

This guide is general information, not legal advice. Codes and bylaws change, and your town's building and zoning officials have the final word on your project. Spotted something out of date? Tell us and we'll recheck it.

Custom Built Storage Sheds for Sale in New England

Family owned since 1969 · Delivered & installed across New England

Ready when you are

Design your building in 3D and see the price, or tell us what you need and we'll quote it.

★★★★★ 4.9 from 497 Google reviews · 0% financing for 18 months

New England Outdoor
Permit checklistFamily owned since 1969
Sheds · Garages · ADUs · Pavilions
@@title@@

Reviewed @@reviewed@@ · Full guide with state rules and sources: @@guide@@

Your project

Town
Zoning district
Building dept. phone
@@product@@ size
Setbacks: frontsiderear
Permit fee
    @@steps@@

Notes

What we give you

    @@give@@

Nearly all of our customers pull their own permit. Rather not deal with the town? We can handle it for a fee. Call us about the permit fee.

Methuen, MA37 Oakland Avenue
Methuen, MA 01844
978-689-4414
Epping, NH372 Calef Highway
Epping, NH 03042
603-751-3800
New England Outdoorneoutdoor.com
★★★★★ 4.9 from 497 Google reviews
Showrooms open Monday to Saturday