Shed, Garage, ADU & Pavilion Permits in Maine
By New England Outdoor · Reviewed · Every rule below links to the law or code it comes from.
Short answer: Maine's building code lets a one-story detached accessory building of 200 sq ft or less skip the building permit[1], but your town can still require one[2]. A garage or ADU is bigger than that, so plan on a permit[1]. Every town over 4,000 residents must enforce the state code[3], and every town regulates the shoreland zone near water[4].
Maine law also makes every town allow at least one ADU on a lot with a single-family home[5].
Maine at a glance
| Building | Building permit? | What to know |
|---|---|---|
| Shed | Not under the state code if 200 sq ft or less[1] | Your town may still require a permit or zoning approval[2], and setbacks still apply[1]. |
| Garage | Yes, where the town issues permits[1] | The code applies even where nobody inspects; the owner is responsible[6]. |
| ADU | Yes | Towns must allow at least one ADU per single-family lot[5]; plumbing and septic approvals too[5, 7]. |
| Pavilion | Ask the code officer | Timber-frame construction is outside the state code[3], but town rules and zoning still apply. |
Towns can set stricter permit rules and their own zoning[2, 8]. Your code enforcement officer has the final word.
Permit guides by product: Sheds · Garages · ADUs · Pavilions
Who enforces Maine's building code
It depends on your town's size.
Maine's statewide code, the Maine Uniform Building and Energy Code (MUBEC), uses the 2021 International Residential Code with Maine amendments for homes and their accessory buildings[2]. Cities and towns with more than 4,000 residents must enforce it[3]. Smaller towns don't have to, but if they enforce a building code, it has to be Maine's[3].
Even in a town that doesn't inspect, the code still applies and you, the owner, are responsible for meeting it[6]. And in a town that must enforce the code but has no inspection setup of its own, the owner hires a state-certified third-party inspector[9].
Do I need a permit for a shed in Maine?
Not from the state code if it's 200 sq ft or less[1], but check your town.
Maine kept the national code's exemption for one-story detached accessory buildings of 200 sq ft or less[1]. That covers our popular 8×12, 10×12, 10×14 and 12×16 sheds. Maine's amendment also says permits are required wherever a town ordinance requires them, and lets towns exempt more[2], so your town's own rules decide.
Skipping the building permit doesn't skip zoning: the shed still has to meet setbacks, lot coverage and shoreland limits[1]. A 12×20 or bigger shed is over the 200 sq ft line[1], so expect a permit in towns that enforce the code.
Do I need a permit for a garage in Maine?
Yes, in any town that issues building permits, and the code applies everywhere.
A detached garage is well over the 200 sq ft exemption, so it needs a building permit in any Maine town that requires permits[1]. A typical application includes construction drawings and a site plan showing the building's size, location and distances to the lot lines[1]. We provide architectural drawings with the foundation specs your foundation contractor builds from.
We make the permit easy
Everything your building department asks for, from us
Nearly all of our customers in Maine pull their own permit, because we give them the paperwork the town wants to see:
- Architectural drawings or a spec sheet, depending on the building
- Truss, rafter, beam and joist seals
- Foundation and footing plans (garages, ADUs, pavilions)
- Stamped plans if your town needs them, for an extra fee
Rather not deal with the town yourself? We can handle the permit for you for a fee. The fee depends on what we're building, so contact us about the permit fee.
ADUs in Maine
Maine towns must allow at least one ADU on a single-family lot wherever homes are allowed.
Under 30-A M.R.S. §4364-B, towns must allow an accessory dwelling unit on a lot with a single-family home anywhere homes are allowed[5]. It can be inside the house, attached, or a new detached building[5]. It must be at least 190 sq ft, and your town may set a maximum size[5]. Towns can't require extra parking for it[5], and one ADU per lot is exempt from density limits[5].
Two changes are phasing in: towns can no longer require the owner to live on the property, starting July 1, 2026 in council-run cities and towns and July 1, 2027 everywhere else[5], and from July 1, 2027 towns can't require planning board approval for an ADU[10].
Before anyone moves in, you must show the town the ADU has adequate water and sewer or septic; a septic system is checked by the local plumbing inspector[5], and adding plumbing needs a plumbing permit[7]. ADUs in the shoreland zone must meet shoreland rules, though towns can't ban them there outright[5].
We build the shell and the interior framing, plus decks and porches, and help you lay out the rooms: living room, kitchen, bathroom, bedrooms and closets. We don't do insulation, drywall, plumbing or electrical, but we can refer contractors from our network.
Do I need a permit for a pavilion in Maine?
A timber-frame pavilion may fall outside the state code, but town rules still apply.
We build both timber-frame and conventionally framed pavilions. Maine's statute says the state building code does not apply to post-and-beam or timber-frame construction[3], so a timber-frame pavilion may not need to meet it. Whether a particular pavilion counts is the local code officer's call, and that exemption doesn't touch zoning, shoreland rules or a town's own permit ordinance[2, 11]. Bring the drawings to the building office and ask before you build.
Building near water: shoreland zoning
Near a lake, river, the ocean or wetland? There's a separate set of rules.
Land within 250 feet of a lake, river, the ocean or certain wetlands, and within 75 feet of some streams, is in Maine's mandatory shoreland zone, which every town must regulate[4]. Under the state's model rules, new buildings, sheds and garages included, must sit at least 100 feet from certain great ponds and 75 feet from other waters and wetlands[11], and built-on surfaces can cover no more than 20% of the part of the lot inside the shoreland zone in most districts[11]. Building there needs a shoreland permit from the town, separate from any building permit[11].
How the permit process works in Maine
Apply with drawings and a site plan; the town has 30 days to decide[12].
Towns have broad home-rule power to set their own zoning, so setbacks, height limits and lot coverage vary from town to town[8]. Expect to submit construction drawings and a site plan[1]. If the town doesn't issue a written decision within 30 days of filing, the permit is considered refused, which you can then appeal[12].
Printable permit checklists
Shed permit checklist
- Call or check your town's building department page: does a shed this size need a building permit?
- Ask the zoning office for the setbacks from your side and rear lot lines, and any limit on height or lot coverage.
- Check for wetlands, a shoreland zone, a flood zone, a historic district or an HOA rule on your lot.
- Sketch a plot plan: lot lines, house, driveway, and the shed with its distances to each lot line.
- Get the shed spec sheet and rafter seals from us (architectural drawings too, for an extra charge, if your town wants them).
- Apply, pay the town's fee, and keep the permit card on site until any final inspection.
- A specification sheet for your shed
- Rafter seals
- Architectural drawings and stamped plans if your town needs them, for an extra charge (rarely needed for sheds)
From New England Outdoor's permit guide, neoutdoor.com/permits/ · Reviewed November 2026. Your town has the final word.
Garage permit checklist
- Confirm zoning: setbacks, maximum height, lot coverage and any limit on accessory buildings.
- Check for wetlands, shoreland, flood zone or historic district review, which can add a separate approval.
- Have a plot plan made: many towns want it to scale, and some want a certified plot plan from a surveyor.
- Get our architectural drawings (with foundation specs), truss seals, beam calculations and joist seals.
- Line up your foundation contractor (we can refer two or three) and an electrician if you want power.
- Apply for the building permit (and separate electrical permit), then book the inspections: footings/foundation, framing, final.
- Architectural drawings, including the foundation specs
- Truss seals
- Beam calculations
- Floor-joist seals
- Stamped plans if your town needs them, for an extra fee
From New England Outdoor's permit guide, neoutdoor.com/permits/ · Reviewed November 2026. Your town has the final word.
ADU permit checklist
- Read your state's ADU rules and your town's ADU bylaw: size cap, owner occupancy, parking, short-term rental limits.
- Check septic and well capacity: adding a bedroom usually needs a septic review or a new design.
- Have a plot plan made showing setbacks, septic, well and driveway.
- Get our architectural drawings, seals and the energy-code details for our windows and doors, then have your contractors add the insulation, plumbing and electrical details.
- Apply for the building permit plus the trade permits (electrical, plumbing, mechanical).
- Book inspections through final, then get the certificate of occupancy before anyone moves in.
- Architectural drawings, including the foundation specs
- Truss seals
- Beam calculations
- Floor-joist seals
- Stamped plans if your town needs them, for an extra fee
- Energy-code details for the windows and doors we supply
- Help laying out the rooms: living room, kitchen, bathroom, bedrooms, closets
- Insulation, plumbing and electrical details come from the contractors who finish the inside (we can refer them)
From New England Outdoor's permit guide, neoutdoor.com/permits/ · Reviewed November 2026. Your town has the final word.
Pavilion permit checklist
- Ask the building department whether your pavilion size needs a permit (open-sided roofs are often treated like any other structure).
- Ask the zoning office for setbacks, height limits and lot coverage.
- Check for wetlands, shoreland, flood zone or pool-area rules on your lot.
- Sketch a plot plan with distances to lot lines, the house and any pool.
- Get our architectural drawings for the pavilion, including the footing plan.
- Apply, then book the footing and final inspections if the town requires them.
- Architectural drawings, including the foundation and footing plans
- Stamped plans if your town needs them, for an extra fee
From New England Outdoor's permit guide, neoutdoor.com/permits/ · Reviewed November 2026. Your town has the final word.
Building in Maine? Ask us about your permit
Tell us what you're planning and your town. We'll tell you what the building department will likely ask for, quote the building, and quote the permit fee if you'd like us to handle it.
- No obligation
- Permit paperwork included with every building
- 0% financing for 18 months
- Prefer to call? 978-689-4414
Want instant pricing? Design & price your shed in 3D.
Maine permit questions
If the town gives no written decision within 30 days of filing, the permit is considered refused and can be appealed[12]. Many towns decide much faster for a simple accessory building.
Most customers pull their own, because we give them the drawings the building department asks for. If you’d rather we handle it, we can for a fee. Contact us about the permit fee.
Sources
We read each rule in the official statute, code or town bylaw and link it here, with the date we last checked it.
- 2021 International Residential Code, Chapter 1 (as adopted in Maine by 08-003 C.M.R. Ch. 6) checked Nov 3, 2026
- 08-003 C.M.R. Ch. 6, MUBEC residential code with Maine amendments checked Nov 3, 2026
- 10 M.R.S. §9724 (Maine Uniform Building and Energy Code: enforcement) checked Nov 3, 2026
- 38 M.R.S. §435 (shoreland areas) and §438-A checked Nov 3, 2026
- 30-A M.R.S. §4364-B (Accessory dwelling units) checked Nov 3, 2026
- Maine Office of Community Affairs, Division of Building Codes and Standards checked Nov 3, 2026
- 30-A M.R.S. §4215(1) checked Nov 3, 2026
- 30-A M.R.S. §3001 (ordinance power) and §4352 (zoning ordinances) checked Nov 3, 2026
- 08-003 C.M.R. Ch. 2 §5.1(E) checked Nov 3, 2026
- PL 2025 c.733 (LD 2173) §15 amending 30-A M.R.S. §4364-A(5-A); §26 application date checked Nov 3, 2026
- 06-096 C.M.R. Ch. 1000, DEP guidelines for municipal shoreland zoning checked Nov 3, 2026
- 30-A M.R.S. §4103(3); MUBEC amendment to IRC R105.3.1 (08-003 C.M.R. Ch. 6 item 14) checked Nov 3, 2026
This guide is general information, not legal advice. Codes and bylaws change, and your town's building and zoning officials have the final word on your project. Spotted something out of date? Tell us and we'll recheck it.

Family owned since 1969 · Delivered & installed across New England
Ready when you are
Design your building in 3D and see the price, or tell us what you need and we'll quote it.
★★★★★ 4.9 from 497 Google reviews · 0% financing for 18 months
Also see: Permit guide for all states
Permit checklistFamily owned since 1969
Sheds · Garages · ADUs · Pavilions
Sheds · Garages · ADUs · Pavilions
@@title@@
Reviewed @@reviewed@@ · Full guide with state rules and sources: @@guide@@
Your project
Town
Zoning district
Building dept. phone
@@product@@ size
Setbacks: frontsiderear
Permit fee
- @@steps@@
Notes
What we give you
- @@give@@
Nearly all of our customers pull their own permit. Rather not deal with the town? We can handle it for a fee. Call us about the permit fee.
Methuen, MA37 Oakland Avenue
Methuen, MA 01844
978-689-4414
Methuen, MA 01844
978-689-4414
Epping, NH372 Calef Highway
Epping, NH 03042
603-751-3800
Epping, NH 03042
603-751-3800
New England Outdoorneoutdoor.com
★★★★★ 4.9 from 497 Google reviews
Showrooms open Monday to Saturday
★★★★★ 4.9 from 497 Google reviews
Showrooms open Monday to Saturday
General information, not legal advice. Codes and bylaws change, and your town's building and zoning officials have the final word. Printed from @@page@@