Shed, Garage, ADU & Pavilion Permits in Massachusetts
By New England Outdoor · Reviewed · Every rule below links to the law or code it comes from.
Short answer: under the Massachusetts building code, a one-story shed of 200 sq ft or less needs no building permit[1], but it still has to meet zoning and wetlands rules[1]. A detached garage always needs a building permit[1], and the building official must issue or deny it in writing within 30 days[1].
Since February 2, 2025, every town under the Zoning Act must allow one ADU by right on a lot in a single-family district[2, 3], up to 900 sq ft or half the house, whichever is smaller[4].
Massachusetts at a glance
| Building | Building permit? | What to know |
|---|---|---|
| Shed | No, if one story and 200 sq ft or less[1] | Zoning setbacks, wetlands rules and other local permits still apply[1]. |
| Garage | Yes[1] | Plot plan from a boundary survey and construction drawings[1]; 48-inch frost depth[5]. |
| ADU | Yes[6] | One ADU by right in single-family districts, up to 900 sq ft or half the house[2, 4]. |
| Pavilion | Plan on it | The exemption is written for sheds, playhouses and similar storage buildings[1]. |
One building code applies statewide[1], but each city and town writes its own zoning[4].
Permit guides by product: Sheds · Garages · ADUs · Pavilions
The Massachusetts building code in 2026
One statewide code: the 10th edition of 780 CMR.
Massachusetts has one building code, the 10th edition of 780 CMR, which has been the only code in effect since June 30, 2025[7]. Homes and their accessory buildings fall under the Massachusetts Residential Code, the 2021 International Residential Code with state amendments[1], in every city and town[1]. Your local building commissioner or inspector of buildings enforces it and issues permits[1].
The 10th edition is a base energy code, and many towns have adopted the stretch or specialized energy code, so a heated building like an ADU may face stricter energy rules depending on the town[7].
Do I need a permit for a shed in Massachusetts?
Not a building permit if it's one story and 200 sq ft or less[1].
The state code exempts a one-story detached shed, playhouse or similar storage building of 200 sq ft or less[1]. That covers our popular 8×12, 10×12, 10×14 and 12×16 sizes. A 12×20 or larger shed is over the line, so it needs a building permit[1].
The exemption is from the building permit only: zoning setbacks, wetlands rules and other local permits still apply[1], and the building commissioner must withhold a permit for anything that would violate zoning[8]. Many towns also limit sheds by size, height or distance to the lot line, so check your town's zoning bylaw.
Do I need a permit for a garage in Massachusetts?
Yes, every detached garage.
A detached garage isn't on the list of exempt work, so it needs a building permit[1]. The application normally includes a plot plan drawn to scale from an accurate boundary survey[1] and construction drawings, which the building official can ask to be stamped where special conditions exist[1]. Footings go to the state's 48-inch frost depth[5], and the code sets wind and ground snow design values town by town[5], so the drawings are made for your town.
Our architectural drawings include the foundation specs your foundation contractor builds from, and we can refer two or three foundation companies.
We make the permit easy
Everything your building department asks for, from us
Nearly all of our customers in Massachusetts pull their own permit, because we give them the paperwork the town wants to see:
- Architectural drawings or a spec sheet, depending on the building
- Truss, rafter, beam and joist seals
- Foundation and footing plans (garages, ADUs, pavilions)
- Stamped plans if your town needs them, for an extra fee
Rather not deal with the town yourself? We can handle the permit for you for a fee. The fee depends on what we're building, so contact us about the permit fee.
ADUs in Massachusetts
One ADU by right on a lot in a single-family district, since February 2, 2025[3].
The Affordable Homes Act changed the Zoning Act so every city or town under it must allow one ADU by right, with no special permit, on a lot in a single-family zoning district[2]. An ADU is a self-contained unit with its own sleeping, cooking and bathroom facilities and a separate entrance, no larger than half the main home's floor area or 900 sq ft, whichever is smaller[4]. A town can't require the owner to live on site, and can require at most one parking space, or none within half a mile of a commuter rail, subway, ferry or bus station[2].
The state's ADU regulations bar towns from requiring an ADU to be attached or detached, requiring a minimum lot size, or applying setbacks or height limits stricter than for the main house or accessory structures[6]. Towns can still apply reasonable rules like site plan review, septic, setbacks and short-term-rental limits[2]. A second ADU on the same lot needs a special permit, if the town allows it at all[2].
By-right zoning doesn't waive health and safety rules: an ADU still needs a building permit, and on septic it must meet Title 5, which can mean upgrading the system[6]. Boston zones under its own special act, so check Boston's own ADU rules[6].
We build the shell and the interior framing, plus decks and porches, and help you lay out the rooms: living room, kitchen, bathroom, bedrooms and closets. We don't do insulation, drywall, plumbing or electrical, but we can refer contractors from our network.
Do I need a permit for a pavilion in Massachusetts?
Wetlands and historic districts
Near a wetland, stream or river? The conservation commission comes first.
Under the Wetlands Protection Act, no one may fill or alter a wetland, bank or riverfront area without filing with the local conservation commission and getting an order of conditions[9]. Land within 200 feet of a river (25 feet in certain dense cities) is a protected riverfront area[9], and work within 100 feet of a wetland may need commission review before you build[10]. In a local historic district, anything that affects exterior appearance needs a certificate from the historic district commission first[11].
How the permit process works in Massachusetts
Zoning has to check out, then a written decision within 30 days[1].
Before a building permit is issued, the project must satisfy zoning and other state requirements such as workers' compensation insurance[1]. You submit a plot plan from a boundary survey[1] and two or more sets of construction drawings[1]. The building official must issue or deny the permit in writing within 30 days of filing[1]. Once issued, the permit expires if work doesn't start within 180 days, though you can ask for an extension in writing[1].
Printable permit checklists
Shed permit checklist
- Call or check your town's building department page: does a shed this size need a building permit?
- Ask the zoning office for the setbacks from your side and rear lot lines, and any limit on height or lot coverage.
- Check for wetlands, a shoreland zone, a flood zone, a historic district or an HOA rule on your lot.
- Sketch a plot plan: lot lines, house, driveway, and the shed with its distances to each lot line.
- Get the shed spec sheet and rafter seals from us (architectural drawings too, for an extra charge, if your town wants them).
- Apply, pay the town's fee, and keep the permit card on site until any final inspection.
- A specification sheet for your shed
- Rafter seals
- Architectural drawings and stamped plans if your town needs them, for an extra charge (rarely needed for sheds)
From New England Outdoor's permit guide, neoutdoor.com/permits/ · Reviewed November 2026. Your town has the final word.
Garage permit checklist
- Confirm zoning: setbacks, maximum height, lot coverage and any limit on accessory buildings.
- Check for wetlands, shoreland, flood zone or historic district review, which can add a separate approval.
- Have a plot plan made: many towns want it to scale, and some want a certified plot plan from a surveyor.
- Get our architectural drawings (with foundation specs), truss seals, beam calculations and joist seals.
- Line up your foundation contractor (we can refer two or three) and an electrician if you want power.
- Apply for the building permit (and separate electrical permit), then book the inspections: footings/foundation, framing, final.
- Architectural drawings, including the foundation specs
- Truss seals
- Beam calculations
- Floor-joist seals
- Stamped plans if your town needs them, for an extra fee
From New England Outdoor's permit guide, neoutdoor.com/permits/ · Reviewed November 2026. Your town has the final word.
ADU permit checklist
- Read your state's ADU rules and your town's ADU bylaw: size cap, owner occupancy, parking, short-term rental limits.
- Check septic and well capacity: adding a bedroom usually needs a septic review or a new design.
- Have a plot plan made showing setbacks, septic, well and driveway.
- Get our architectural drawings, seals and the energy-code details for our windows and doors, then have your contractors add the insulation, plumbing and electrical details.
- Apply for the building permit plus the trade permits (electrical, plumbing, mechanical).
- Book inspections through final, then get the certificate of occupancy before anyone moves in.
- Architectural drawings, including the foundation specs
- Truss seals
- Beam calculations
- Floor-joist seals
- Stamped plans if your town needs them, for an extra fee
- Energy-code details for the windows and doors we supply
- Help laying out the rooms: living room, kitchen, bathroom, bedrooms, closets
- Insulation, plumbing and electrical details come from the contractors who finish the inside (we can refer them)
From New England Outdoor's permit guide, neoutdoor.com/permits/ · Reviewed November 2026. Your town has the final word.
Pavilion permit checklist
- Ask the building department whether your pavilion size needs a permit (open-sided roofs are often treated like any other structure).
- Ask the zoning office for setbacks, height limits and lot coverage.
- Check for wetlands, shoreland, flood zone or pool-area rules on your lot.
- Sketch a plot plan with distances to lot lines, the house and any pool.
- Get our architectural drawings for the pavilion, including the footing plan.
- Apply, then book the footing and final inspections if the town requires them.
- Architectural drawings, including the foundation and footing plans
- Stamped plans if your town needs them, for an extra fee
From New England Outdoor's permit guide, neoutdoor.com/permits/ · Reviewed November 2026. Your town has the final word.
Building in Massachusetts? Ask us about your permit
Tell us what you're planning and your town. We'll tell you what the building department will likely ask for, quote the building, and quote the permit fee if you'd like us to handle it.
- No obligation
- Permit paperwork included with every building
- 0% financing for 18 months
- Prefer to call? 978-689-4414
Want instant pricing? Design & price your shed in 3D.
Massachusetts permit questions
The building official must issue or deny it in writing within 30 days of filing[1]. Wetlands or zoning reviews can add time before you apply.
Usually yes: the application normally needs a plot plan drawn to scale from an accurate boundary survey[1].
Most customers pull their own, because we give them the drawings the building department asks for. If you’d rather we handle it, we can for a fee. Contact us about the permit fee.
Sources
We read each rule in the official statute, code or town bylaw and link it here, with the date we last checked it.
- 780 CMR 51.00, Massachusetts Residential Code, Chapter 1 (Scope and Administration) checked Nov 3, 2026
- M.G.L. c. 40A, §3 (ADU paragraph, added by St. 2024, c. 150) checked Nov 3, 2026
- St. 2024, c. 150 (Affordable Homes Act), § 143; EOHLC ADU page checked Nov 3, 2026
- M.G.L. c. 40A, §1A (Zoning Act definitions) checked Nov 3, 2026
- 780 CMR 51.00, Massachusetts Residential Code, Chapter 3 (Building Planning) checked Nov 3, 2026
- 760 CMR 71.00, Protected use accessory dwelling units (EOHLC) checked Nov 3, 2026
- Mass.gov: Tenth edition of the Massachusetts State Building Code (780 CMR) checked Nov 3, 2026
- M.G.L. c. 40A, § 7 (Zoning Act — enforcement) checked Nov 3, 2026
- M.G.L. c. 131, §40 (Wetlands Protection Act) checked Nov 3, 2026
- 310 CMR 10.02(2)(b) Activities Within the Buffer Zone (MassDEP Wetlands Protection Act Regulations) checked Nov 3, 2026
- M.G.L. c. 40C, § 6 (Historic Districts Act) checked Nov 3, 2026
This guide is general information, not legal advice. Codes and bylaws change, and your town's building and zoning officials have the final word on your project. Spotted something out of date? Tell us and we'll recheck it.

Family owned since 1969 · Delivered & installed across New England
Ready when you are
Design your building in 3D and see the price, or tell us what you need and we'll quote it.
★★★★★ 4.9 from 497 Google reviews · 0% financing for 18 months
Also see: Permit guide for all states
Permit checklistFamily owned since 1969
Sheds · Garages · ADUs · Pavilions
Sheds · Garages · ADUs · Pavilions
@@title@@
Reviewed @@reviewed@@ · Full guide with state rules and sources: @@guide@@
Your project
Town
Zoning district
Building dept. phone
@@product@@ size
Setbacks: frontsiderear
Permit fee
- @@steps@@
Notes
What we give you
- @@give@@
Nearly all of our customers pull their own permit. Rather not deal with the town? We can handle it for a fee. Call us about the permit fee.
Methuen, MA37 Oakland Avenue
Methuen, MA 01844
978-689-4414
Methuen, MA 01844
978-689-4414
Epping, NH372 Calef Highway
Epping, NH 03042
603-751-3800
Epping, NH 03042
603-751-3800
New England Outdoorneoutdoor.com
★★★★★ 4.9 from 497 Google reviews
Showrooms open Monday to Saturday
★★★★★ 4.9 from 497 Google reviews
Showrooms open Monday to Saturday
General information, not legal advice. Codes and bylaws change, and your town's building and zoning officials have the final word. Printed from @@page@@