Do You Need a Permit for a Shed in Andover, MA?
Shed rules in Andover
- Building permit only over 200 sq ft[1], so our 8×12 through 12×16 sizes don't need one.
- At least 5 feet from the side and rear property lines[1]. Inside the normal setback area, an accessory building must be in the rear yard, no more than 1.5 stories, and cover no more than 30% of that yard area[2].
- Wetlands on the lot? Andover's local bylaw is stricter than state law: the inner 25 feet of the buffer is no-disturb and the inner 50 feet is no-build[3]. Check with the Conservation Department first[1].
- In the Ballardvale Historic District, a new outbuilding visible from the street needs a Certificate of Appropriateness first[4].
- If you do need a permit, the fee is $25 plus $13 per $1,000 of construction cost, and work without a permit costs double[5].
Checked Nov 3, 2026 against the town's own documents. Your building and zoning officials have the final word.
The Massachusetts rule
No, if one story and 200 sq ft or less[6].
Zoning setbacks, wetlands rules and other local permits still apply[6]. Towns can be stricter than the state, which is why Andover's own rules come first on this page. Full Massachusetts shed rules · Shed permits in every New England state
Where to apply in Andover
- Building Division (Inspector of Buildings / Building Commissioner) · 978-623-8620
- Zoning Board of Appeals (zoning, special permits, variances) · 978-623-8627
- Planning Division (Planning & Economic Development) · 978-623-8650
- Conservation Department / Conservation Commission (wetlands) · 978-623-8630
- Ballardvale Historic District Commission · 978-623-8620
Zoning rules: Town of Andover Zoning Bylaw (Andover Code, Article VIII)
Our work in Andover
We make the permit easy
Everything your building department asks for, from us
Nearly all of our customers in Massachusetts pull their own permit, because we give them the paperwork the town wants to see:
- A specification sheet for your shed
- Rafter seals
- Architectural drawings and stamped plans if your town needs them, for an extra charge (rarely needed for sheds)
Rather not deal with the town yourself? We can handle the permit for you for a fee. The fee depends on what we're building, so contact us about the permit fee.
Shed permit checklist
Shed permit checklist
- Call or check your town's building department page: does a shed this size need a building permit?
- Ask the zoning office for the setbacks from your side and rear lot lines, and any limit on height or lot coverage.
- Check for wetlands, a shoreland zone, a flood zone, a historic district or an HOA rule on your lot.
- Sketch a plot plan: lot lines, house, driveway, and the shed with its distances to each lot line.
- Get the shed spec sheet and rafter seals from us (architectural drawings too, for an extra charge, if your town wants them).
- Apply, pay the town's fee, and keep the permit card on site until any final inspection.
- A specification sheet for your shed
- Rafter seals
- Architectural drawings and stamped plans if your town needs them, for an extra charge (rarely needed for sheds)
From New England Outdoor's permit guide, neoutdoor.com/permits/ · Reviewed November 2026. Your town has the final word.
Planning a shed in Andover? Ask us about the permit
Tell us what you're planning and your town. We'll tell you what the building department will likely ask for, quote the building, and quote the permit fee if you'd like us to handle it.
- No obligation
- Permit paperwork included with every building
- 0% financing for 18 months
- Prefer to call? 978-689-4414
Want instant pricing? Design & price your shed in 3D.
Shed permits in Andover: questions
Building Division (Inspector of Buildings / Building Commissioner), 978-623-8620. Most of our customers pull their own permit with the paperwork we provide, and we can handle it for a fee.
Sources
We read each rule in the official statute, code or town bylaw and link it here, with the date we last checked it.
- Andover Building Division FAQ, 'Do I need a permit for a shed?' checked Nov 3, 2026
- Andover Zoning Bylaw §4.2.2 Yard Depth, as excerpted in the Building Division 'Zoning Setbacks' handout (rev. 10-9-25) checked Nov 3, 2026
- Andover Conservation, 'Wetland Permitting - An Applicant's Guide' checked Nov 3, 2026
- Andover, Ballardvale Historic District Commission page checked Nov 3, 2026
- Town of Andover Building Division permit fee schedule (effective January 2, 2024) checked Nov 3, 2026
- 780 CMR 51.00, Massachusetts Residential Code, Chapter 1 (Scope and Administration) checked Nov 3, 2026
This guide is general information, not legal advice. Codes and bylaws change, and your town's building and zoning officials have the final word on your project. Spotted something out of date? Tell us and we'll recheck it.

Family owned since 1969 · Delivered & installed across New England
Ready when you are
Design your building in 3D and see the price, or tell us what you need and we'll quote it.
★★★★★ 4.9 from 497 Google reviews · 0% financing for 18 months
Also see: Shed permit guide · Massachusetts permits
Permit checklistFamily owned since 1969
Sheds · Garages · ADUs · Pavilions
Sheds · Garages · ADUs · Pavilions
@@title@@
Reviewed @@reviewed@@ · Full guide with state rules and sources: @@guide@@
Your project
Town
Zoning district
Building dept. phone
@@product@@ size
Setbacks: frontsiderear
Permit fee
- @@steps@@
Notes
What we give you
- @@give@@
Nearly all of our customers pull their own permit. Rather not deal with the town? We can handle it for a fee. Call us about the permit fee.
Methuen, MA37 Oakland Avenue
Methuen, MA 01844
978-689-4414
Methuen, MA 01844
978-689-4414
Epping, NH372 Calef Highway
Epping, NH 03042
603-751-3800
Epping, NH 03042
603-751-3800
New England Outdoorneoutdoor.com
★★★★★ 4.9 from 497 Google reviews
Showrooms open Monday to Saturday
★★★★★ 4.9 from 497 Google reviews
Showrooms open Monday to Saturday
General information, not legal advice. Codes and bylaws change, and your town's building and zoning officials have the final word. Printed from @@page@@







